HomeDLM Jewelry DesignsDMAX VideosDMAX PhotosDMAX AudioGaugesAboutLinksEmail Me

Connection Prep

I hate running extra wire up to the overhead so I buss the power and ground connections for the cluster. One hot lead and one ground lead up to power the gauges and switches. The switches will fire relays for future needs so no amperage worries. The harnesses are soldered and heat shrinked. Velcro makes a great reusable wire management system.
 
     
     First        Prev     Next        Last     


|Home| |DLM Designs| |DMAX Videos| |DMAX Photos| |DMAX Audio| |Gauges| |About| |Links|


Copyright 1999. Positive Software Corporation. All rights reserved